Be able to select multiple issues, defects, backlogs and drag/drop within a view. Now the only way I know to do it is to select various items throughout the project and then rank to top or bottom, and then drag/drop one at a time within project where I want them.

I am the Product Owner and when I drag/drop items to prioritize, it is difficult to do one at a time.

Comments

  • This is a high priority for us. Limiting the bulk ranking to just the top or just the bottom does not cut it when you need to bulk rank to a specific location in the backlog.

  • This has been commented on several times by Product Managers. Its hard and frustrating to keep track and drag items all the way from top to bottom on multiple items.

  • The new ranking functionality doesn't support the drag and drop of multiple selected items, preventing the user to manage more in bulk (outside of the move function). The older ranking column method worked much better.

  • What we would like to do, for instance, would be to check off items 6-10, 12, and 14 and drag them beneath item 2. The resulting order—assuming 15 items total—would be: 1, 6, 7, 8, 9, 10, 12, 14, 2, 3, 4, 5, 11, 13, 15. This is possible in JIRA...